Projects

Chicopee Water Department Water Main Installations

The following projects are all of the "in-house" nature, meaning they were designed and installed solely by Chicopee Water personnel.  None of the large scale water main installations that are part of the Sewer Separation Projects are included.

Wiley St Project

This summer, the CWD installed 500 feet of 6-inch ductile iron pipe and 2 fire hydrants on Wiley St.  The street was formerly fed off just a 2-inch line.  This system upgrade improved the flow capacity for all houses on the street, as well as added much needed fire protection.

Trilby St Project

The CWD laid 400 feet of 6-inch ductile iron pipe and a fire hydrant on Trilby St from Arcade St to Christopher St this past spring.  This section of Trilby St was previously fed by a only 2-inch copper line.

Hooper Rd Project

In the spring of 2015, the CWD laid approximately 400 feet of 2-inch copper to feed 2 houses on Hooper Rd.  Before the new installation, the houses had been fed by a 1-inch line that was tapped on Coolidge Rd.